Developing sports competitions and improving people's physical fitness are the basic principles of our country's sports culture work. Today, with the rapid development of the sports industry, with the continuous innovation of sports and fitness methods, the stadium equipment must also be upgraded. The emergence of the new inflatable membrane structure air dome gymnasium solves the difficulty, long time and high threshold of gymnasium construction. It is conducive to the construction of various types of sports venues and increases the average sports venue area.
At present, the use of inflatable dome structure air dome buildings is very wide, with the advantages of fast construction, low overall construction cost, and large usable space. Applicable to sports culture, industrial production, environmental protection, warehousing and logistics, emergency disaster relief sites, etc. A new type of inflatable dome structure building without any steel frame structure, along with the development of society, has sprung up like mushrooms in various parts of China.
What infrastructure is needed for the Air dome Stadium?
The air dome stadium is a temporary building, and the air dome building has not been included in the fire protection regulations to manage in our country. When government departments across the country review projects and buildings, they follow the construction report of temporary buildings, and do not need to apply for procedures in accordance with traditional Chinese buildings. Therefore, the air dome building is convenient for construction reporting, and the review procedures are simple. At the construction level, we must attach great importance to the preparatory work before the construction of the project. Since the early preparation work is the basis for the success of the construction of a new project in the middle and later stages, the preparation work is done well. Pros and cons directly affect the project progress, construction quality and safe construction. The preparation work and infrastructure are carried out from the aspects of early design, construction area, equipment preparation, personnel preparation, raw material preparation, basic construction site area, etc.