Advantages of gas film

Air dome stadium solution - economical, fast and low-cost

In this era of unprecedented attention to the sports industry, China's per capita sports area is insufficient, which is one tenth of that of the United States, Japan and other countries.


The traditional structure of stadiums and gymnasiums has many problems, such as high cost, high energy consumption, slow construction speed, and so on. The series of application solutions of Alpine Air-film stadiums and gymnasiums will solve these problems.


At present, sports venues have become one of the most widely used fields of air-film architecture.


01
Low cost

Compared with traditional reinforced concrete buildings,




The construction cost of gas film should be reduced by more than 30%.


02
Large span

The air-film building is mainly supported by the internal air pressure, and its dead weight is very low,




It can easily achieve a large span of more than 100 meters.


03
portability

The air-film building has simple structure, convenient construction and low requirements on the ground,




Therefore, it has the characteristics of secondary construction and even multiple disassembly.



04
Keep safe

The air-film building is supported by wind pressure and has no beams and columns inside,




Strong wind and snow resistance


05
Fast construction

The air dome building has light weight and does not need complex foundation treatment,




Generally, it only takes about 20-30 days from production to installation.


Get quotation and design scheme for free
Comparison of advantages
Removable: simple foundation treatment, can be dismantled repeatedly
Large span: the span can reach 110 meters, and there is no beam or column inside
Anti-corrosion: PVDF coating on the surface, anti-corrosion and flame retardant
Construction speed: no special restrictions, construction completed within one month
Safety: strong resistance to wind and snow
Intelligent system: indoor temperature, lighting, ventilation, 24-hour intelligent monitoring
Foundation treatment: available or not
Cost savings: 30%
Installation difficulty: easy, without beams and columns inside, saving manpower and material resources
Non-moveable: fixed buildings, not removable repeatedly
Large span: no more than 80m
Corrosive: steel is easily corroded
Construction speed: more than 3 months
Wind and snow resistance: unable to withstand heavy snow backlog and easy to collapse
Intelligent system: none
Foundation treatment: foundation must be laid
Cost: high
Installation difficulty: relatively high, prone to engineering accidents
Learn more about the advantages of gas film
APPLICATION CASE
Own strength
01
INDUSTRY AND TRADE INTEGRATION

GS air dome is an enterprise that focuses on research, development, design as well as production of air-supported membrane structure, and is a full-case supplier of air dome product solutions.


02
DEEP EXPERIENCE

GS has worked in the field of mobile construction for 17 years, and has accumulated experience in thousands of customers service and thousands of projects, with a maximum service area of nearly 50000 square meters.

03
PRODUCT SELF-USE

The main plant of GS air dome is a large air-film building, which covers an area of nearly 10000 square meters and can accommodate four Olympic standard swimming pools.


04
RAPID CONSTRUCTION

The air dome building does not need complex foundation treatment, and can be completed in 15 days under normal circumstances, effectively reducing your construction costs.


05
WIND AND SNOW RESISTANCE

The company is located in the north of China, and can cope with - 30 ℃ low temperature, wind of 10 force strong and 50cm snow after preliminary data collection and systematic experiments and research.

06
RICH PROJECT EXPERIENCE

Gs air dome technology R&D personnel and external construction team have a large number of people whom are technically hard. They can conduct one-on-one consultation and customization, and have rich construction experience.


Never met, but can tell!
More than ten years of customized experience in the film industry, providing you with effective and reasonable space solutions
National service hotline
+86-13604028886
E-mail:info@gstent.com
Add:South of Liaozhong Industrial Park, Shenyang, Liaoning Province
About us :
Whatsapp
WeChat
design by:seqill.cn