Air film specification: length 77m x width 46.6m 3588.2m2
Project completion time: October 2019
Basic information of the project:
The project is designed as an indoor comprehensive sports hall, with prefabricated ring beams fixed, thermal insulation and natural lighting scheme to achieve the purpose of energy conservation and emission reduction. The whole construction period of the project is 35 days.