Airport Air Traffic Control Staff Activity Center

Specification of gas film: length 38m x width 31m 1178m2


Project completion time: October 2019


Basic information of the project: the main body of the project is Shenyang Airport Air Traffic Control Bureau, the prefabricated ring beam is fixed, the design is a basketball and badminton stadium, the design scheme of thermal insulation and natural lighting, and the imported DuPont membrane material is used to achieve the energy conservation goal. The whole construction period of the project is 20 days.