Air dome football training ground

Air dome specification: Hall 1: length 67m x width 38m 2546m2




Project completion time: September 2020




Hall 2: length 65m x width 40m 2600m2




Basic information of the project: The project is designed as a football training ground, adopting the prefabricated ring beam fixation scheme, thermal insulation and natural lighting scheme to achieve the purpose of energy conservation and emission reduction. The whole construction period of the project is 40 days.