Developing trend sports competitions and improving people's physical fitness are the basic principles in China's sports and cultural work. In today's era of rapid development of sports, with the continuous innovation of sports and fitness methods, sports venues and equipment must also be upgraded. The emergence of the new gas-filled membrane structure gas-film stadium has solved the problems of difficult, long time and high threshold for the construction of sports venues, which is conducive to the various forms of basic construction of stadiums and improve the average total area of stadiums and gymnasiums.






At this stage, the main use of air dome structure is very common, with the advantages of fast construction, low comprehensive engineering cost, and large usable indoor space. It is applicable to sports culture, industrial production, environmental protection, warehousing and logistics, emergency disaster relief sites, etc. With the development trend of social development, a new type of inflatable membrane structure engineering building without all the supporting points of steel frame structure has mushroomed in all regions of China.



What infrastructure is required for the air dome stadium?


The air dome gymnasium belongs to temporary engineering buildings. In China, the air dome building has not been included in the fire protection code to manage the method. Government departments all over the country apply for construction according to the temporary construction report and do not need to go through the formalities as traditional Chinese buildings do when reviewing the engineering construction. Therefore, the air dome building is easy to report for construction, and the review and handling procedures are simple. At the construction level, great attention should be paid to the preparation work before the construction of the project. Because the early preparation work is the basis for the success of the construction of a new project in the middle and later stages, the quality of the preparation work will immediately affect the project progress, construction quality and safe construction. The preparation work and its infrastructure are carried out from the aspects of early design plan, total construction area, industrial equipment preparation in advance, staff preparation in advance, raw materials preparation in advance, and basic construction site area.



The air dome gymnasium is built up of membrane materials and infrastructure. It is the sixth building decoration material after brick, stone, concrete, steel and wood. The engineering construction textile products with stable appearance and can bear certain load are made of polyester fiber fabric, needle-punched non-woven fabric, PVDF, PVF, PTFE and other different surface coatings, and PVC. An intelligent management system is set up to supervise the internal temperature, ambient humidity, standard air pressure and other data information of the air-dome gymnasium. Compared with traditional Chinese construction, the cost of air dome construction is lower and the cost of maintenance is lower. The maintenance staff can carry out the daily maintenance of the air dome. It is a building form that conforms to China's low-carbon environmental protection, emerald green, environmental protection, environmental protection and energy conservation.


Never met, but can tell!
More than ten years of customized experience in the film industry, providing you with effective and reasonable space solutions
National service hotline
+86-13604028886
E-mail:info@gstent.com
Add:South of Liaozhong Industrial Park, Shenyang, Liaoning Province
About us :
Whatsapp
WeChat
design by:seqill.cn